Engineer patch book
Engineer patch book
Times are UTC. Entered time records transcription; effective time records the physical work.
| Entry / UTC entered | UTC effective | Camera / recorder | Work |
|---|---|---|---|
| SV-258 / 2006-08-27T18:40:00Z | 2006-08-27T18:38:00Z | WG-01 / R-W3 | CONNECT. Existing west-gate patch confirmed. |
| SV-259 / 2006-08-27T19:56:10Z | 2006-08-27T19:51:00Z | WG-01 / R-W3 | DISCONNECT. No input after physical patch change. Book transcribed on engineer return. |
| SV-260 / 2006-08-27T19:56:20Z | 2006-08-27T19:51:00Z | WG-01 / R-W4 | CONNECT. Replacement accepts west-gate input; clock run W4-A retained on connection. Equipment card not reprinted. |
| SV-261 / 2006-08-27T19:55:00Z | 2006-08-27T19:49:00Z | NC-02 / R-N2 | CONNECT. North corridor signal check; no west-gate connection. |
| SV-262 / 2006-08-27T20:02:00Z | 2006-08-27T19:58:00Z | WG-01 / R-W4 | CLOCK SET. Clock adjusted; run W4-A ended and W4-B began. Existing tape retains the old picture clock. |